Overview
The Eaton 19817-010 is an E-Locker for front Dana 30 axles with 27 splines and a 3.54 down ratio designation. Dana 30 JK, Dana 30 TJ, Dana 30 Standard and Dana 30 Reverse axle types are covered.
A push button switch selects locked or open operation, and the unit draws only 12 volt power. No air lines or cables are part of the design, so the install is mainly electrical routing and carrier work.
Key features
- Push button selection between locked and open
- 12 volt power only
- 27 spline front axle fitment
- Dana 30 JK, TJ, Standard and Reverse axle types listed
- No air lines or cables
Front axle duty
A front locker changes how the steering and drive parts work under load, so it deserves a careful look before installation. Front axles carry the CV joints or axle shafts that transmit power to the wheels, and a locked front axle puts extra stress on them during tight turns. Drivers who use the locker mainly off road often find that the front wheels bind when they turn on pavement.
Choosing a front locker means matching the axle housing, the spline count and the gear ratio before buying. Front axle parts that are worn, such as tie rod ends, ball joints and U-joints, are often inspected at the same time because they share the same load path. Checking those parts before a trail trip keeps the locker from exposing a weak link.
- Inspect CV joints or axle shafts
- Check tie rod ends and ball joints
- Confirm steering clearance in tight turns
- Keep the front driveline in good condition
Specifications
| Brand | Eaton |
|---|---|
| Part number | 19817-010 |
| UPC | 700000493458 |
| Axle manufacturer | Dana |
| Axle location | Front |
| Axle types | Dana 30 JK, Dana 30 TJ, Dana 30 Standard, Dana 30 Reverse |
| Axle spline | 27 splines |
| Ratio designation | 3.54 down |
| Locker type | E-Locker, push button selectable |
| Power | 12 volt |
Vehicle fitment
No vehicle is listed. Dana 30 names are axle designations rather than vehicle models, so the 27 spline count, front position and 3.54 down ratio are the points to check against your housing.
Confirm your vehicle’s year, model and trim before ordering. Spline count decides whether the shafts will fit.
Installation notes
Front carrier work includes removing the cover and carrier and setting ring and pinion backlash. A gear shop is the right place for that. Route the 12 volt supply and the switch before reassembly.
What’s included
One E-Locker unit, part number 19817-010, is the item.
Not included: Switch and wiring are not covered, and no ring gear or pinion is described.











