Overview
The Trail Gear 110187-1-KIT is an air shock hoop mounting kit for fabricating custom shock mounts on a frame or exo-cage. It is a universal application kit rather than a part sized for one vehicle.
The kit pairs two large hoops with one section of tubing. The hoops are coped and welded onto the frame or exo-cage, the tubing is cut to length and welded between them, and the shock mounts are then welded onto the tube at the chosen location.
Key features
- Two large hoops that can be coped and welded to a frame or exo-cage
- One section of tubing that can be cut to size and welded between the hoops
- Tubing is 1035 DOM steel
- Parts ship unpainted
Planning a fabricated shock mount
A custom shock mount on a frame or exo-cage works as a fabricated load path, so the hoops, tube and welds all carry shock loads over rough terrain. Lay out the shock locations on the frame first, then cut the tubing to match, which is easier than correcting a tube that is too long after welding.
Steel selection and weld quality matter. Clean mill scale and rust from every contact surface before fitting, and keep the heat input moderate to avoid warping thin frame sections. A welder experienced with suspension work can check cope fit and penetration before the parts are loaded.
After welding, inspect the joints for cracks once the vehicle has been driven through rough terrain, and recoat bare steel promptly to slow rust.
- Lay out shock positions before cutting tube
- Clean contact surfaces before fitting hoops
- Inspect welds after the first off-road outings
Specifications
| Brand | Trail Gear |
|---|---|
| Part number | 110187-1-KIT |
| UPC | 70000621774 |
| Tubing material | 1035 DOM steel |
| Tubing length | Measure the frame or exo-cage span and confirm the tubing length before ordering or cutting. |
| Finish | Unpainted as shipped |
Vehicle fitment
It is a universal application kit, so it must be fitted to your own frame or exo-cage. Confirm fit by measuring the mounting span and shock length before welding.
Confirm your vehicle’s year, model and trim before ordering.
Installation notes
Hoop coping, tubing cuts and shock mount welds are fabrication steps, so plan the shock locations before cutting the tubing. Have the welds made by a qualified welder experienced with frame work, and paint or coat the steel after welding because the parts ship unpainted.
What’s included
Two large hoops and one section of tubing.
Not included: Shock absorbers and the shock mounts themselves, which are welded onto the tube.












